Skip to main content

Case Studies

Discover how we've partnered with innovative companies to solve complex challenges and deliver exceptional results.

Streamlining Global Talent Management - Case study for Condé Nast, Vogue

Condé Nast, Vogue

Media, Fashion

Streamlining Global Talent Management

How Irysan built a scalable event-driven talent management platform for Condé Nast, reducing casting time by 60% and administrative overhead by 80% using AWS EventBridge.

talent management platformevent-driven architectureAWS EventBridge
Read case study
From On-Prem to Cloud-First: Empowering Energy Trading - Case study for OVO Energy

OVO Energy

Energy Supply, Energy Trading

From On-Prem to Cloud-First: Empowering Energy Trading

How Irysan migrated OVO Energy Trading Requirement Model from SQL Server to Google BigQuery, improving query performance, reducing infrastructure costs, and enabling cloud-first analytics.

cloud migrationBigQuerySQL Server migration
Read case study
Raising the Bar on Engineering Standards - Case study for The Raspberry Pi Foundation, Code Club

The Raspberry Pi Foundation, Code Club

EdTech, Education

Raising the Bar on Engineering Standards

How Irysan modernised Code Club platform with TypeScript, Tanstack Query, and React best practices, removing 317,000 lines of code while delivering new learner engagement features.

TypeScript migrationReact modernisationtechnical debt reduction
Read case study
Saving $150k on Operational Costs with Snowflake and Streamlining Access to Data - Case study for FutureLearn

FutureLearn

EdTech

Saving $150k on Operational Costs with Snowflake and Streamlining Access to Data

How Irysan reduced FutureLearn Snowflake costs by $150k annually through incremental data models, unused model removal, and improved data team alignment.

Snowflake cost optimisationdata platform efficiencyincremental data models
Read case study
Seamless SaaS Integration: From Zero to Live - Case study for FutureLearn

FutureLearn

EdTech

Seamless SaaS Integration: From Zero to Live

How Irysan delivered a complete Cornerstone LMS implementation for FutureLearn in 3 months, enabling B2B enterprise growth and government contracts.

LMS implementationCornerstone LMSenterprise learning platform
Read case study
Achieving 50% Cost Reduction and Scalable Efficiency - Case study for FutureLearn

FutureLearn

EdTech

Achieving 50% Cost Reduction and Scalable Efficiency

How Irysan achieved 50% AWS cost savings for FutureLearn through database right-sizing, Fargate migration, resource tagging, and snapshot optimisation.

AWS cost optimisationcloud cost reductionFargate migration
Read case study
65% Faster Deployments: a DevOps Success Story - Case study for OVO Energy

OVO Energy

Energy

65% Faster Deployments: a DevOps Success Story

How Irysan reduced OVO Energy deployment times by 65% through CI/CD pipeline optimisation, build caching, and test parallelisation.

CI/CD pipeline optimisationDevOps transformationdeployment automation
Read case study
Continuous Improvement with Test Automation - Case study for OVO Energy

OVO Energy

Energy

Continuous Improvement with Test Automation

How Irysan transformed OVO Energy QA with shift-left testing methodology, automated regression testing, and CI/CD integration for Ofgem compliance.

test automationQA transformationshift-left testing
Read case study
Standardising OVO's Development Ecosystem - Case study for OVO Energy

OVO Energy

Energy

Standardising OVO's Development Ecosystem

How Irysan standardised OVO Energy development practices with Terraform IaC, CI/CD pipelines, and project templates to reduce technical debt.

developer experiencetechnical debt reductionCI/CD pipelines
Read case study
Unlocking Data's Hidden Treasure - Case study for OVO Energy

OVO Energy

Energy

Unlocking Data's Hidden Treasure

How Irysan achieved 63% reduction in BigQuery and GCP costs for OVO Energy through a 10-day cloud audit and strategic billing optimisation.

BigQuery cost optimisationGCP cost reductioncloud cost audit
Read case study